The Town of Whitby, in partnership with the South Brooklin Landowners Group, have conducted a Schedule ‘C’ Municipal Class Environmental Assessment (MCEA) study for the Mid-Block Arterial Road. Following consultation with the public, major stakeholders, property owners, Indigenous Communities and other agencies, a preferred design alignment for the Mid-Block Arterial Road has been identified.
The study has been completed and an Environmental Study Report (ESR) has been prepared which documents the MCEA process, the preferred design alignment, the anticipated environmental and property impacts, proposed mitigation measures, and a summary of consultation undertaken throughout the study.
In accordance with the MCEA process requirement, the ESR will be placed on public record for a 30-day comment period beginning June 3, 2021. Due to the ongoing COVID-19 pandemic situation, only digital copies of the ESR are available at www.midblockea.ca.
Written comments or questions should be sent directly to midblockea@tmig.ca before July 5, 2021.
Horace Look, P. Eng.
Program Manager, Capital Infrastructure
Town of Whitby
575 Rossland Road East
Whitby, ON L1N 2M8
905.430.4935
lookh@whitby.ca
This notice was first issued on June 3, 2021.